When will the final permit be issued?
IDEM issued the final Industrial Stormwater General Permit (ISGP) on 12/30/25. IDEM has not yet provided the Notice of Intent (NOI) form/mechanism to transition permit coverage from Rule 6 to the ISGP. Concurrently, IDEM is in the process of completing the rulemaking which will repeal Rule 6. Facilities should continue to comply with Rule 6 requirements until Rule 6 is repealed.
How do I transition coverage to the new permit?
For facilities currently covered under Rule 6 and that wish to continue storm water coverage under the ISGP, the facility must submit a new Notice of Intent (NOI) to comply with the requirements of the ISGP within 180 days following the date that IDEM makes the NOI available to the permittee. The NOI and all supporting documents must be submitted online through the Regulatory Services Portal. Applicants are required to pay the fee online to expedite processing.
Will my permit start date and expiration date be the same?
No. Under Rule 6, each permitted facility has a unique expiration date based upon five (5) years from when coverage commences. Under the ISGP, all permitted facilities will have the same expiration date and 5-year permit cycle.
Will stormwater sampling requirements change?
Yes. Under Rule 6, all permitted facilities are required to sample a group of eight pollutants annually. The ISGP requires facilities to sample for sector-specific parameters identified in Appendix A of the permit. Sector is determined by SIC code. The ISGP requires that four samples be collected during the first two years (eight calendar quarters) of permit coverage. Each of the four different calendar quarters must be represented by a benchmark sampling event. If the average of the four collected samples is below USEPA’s “benchmark” concentration for all pollutants, the benchmark monitoring condition is satisfied for the remainder of the five-year permit term. If the average concentration exceeds the benchmark for any outfall/pollutant, corrective action must be taken and another set of four samples (over the subsequent two years) must be collected. If less than four benchmark samples have been taken, but the results are such that an exceedance of the four quarter average is mathematically certain (i.e., if the sum of quarterly sample results is more than four times the benchmark level) this is considered a benchmark exceedance. IDEM will continue to allow for designation of outfalls as “substantially similar” which can allow for monitoring one outfall to represent multiple outfalls if the drainage areas are substantially similar.
In addition to benchmark monitoring, the ISGP requires that permittees identify if they discharge to an impaired water body segment. If it is determined that the water body segment is impaired, permittees are required to conduct annual monitoring for pollutants for which the water body is impaired and are associated with the industrial site activity. If the pollutant of concern is not detected and not expected to be present in the facility’s discharge, the permittee may request to discontinue impaired waters monitoring for that pollutant.
Will site inspection requirements change?
Yes. Similar to Rule 6, the ISGP will require quarterly storm water site inspections that are intended to address housekeeping, best management practices (BMPs) and detect any issues that could affect storm water discharge. The ISGP also requires quarterly visual assessment (QVAs) of storm water discharge. During these QVAs, a storm water sample is collected in a clean, clear jar and visually inspected for abnormal attributes (e.g., color, sheen, turbidity).
Will I need to update my Storm Water Pollution Prevention Plan (SWPPP)?
Yes. SWPPPs will need to be updated to reflect the aforementioned new permit monitoring requirements. As with Rule 6, the SWPPPs are not required to be submitted to the IDEM. SWPPPs must be updated to align with ISGP requirements before an NOI can be submitted.
Will reporting requirements change?
Yes, as with the current Rule 6 program, all facilities will be required to prepare Discharge Monitoring Reports (DMRs) and Annual Reports (ARs). Under the ISGP, all DMR reporting must be completed through the web-based netDMR reporting portal. DMRs will be due by the 28th day following each monitoring period. Presumably, each calendar quarter for the first two years of permit coverage will be identified as a monitoring period. IDEM will pre-populate DMR frequency and parameters for each facility. Due to the volume of facilities that will obtain sample coverage, this may take IDEM some time. In the interim, IDEM will continue to allow paper submittals.
The Annual Report is required to be prepared no later than 365 days from the effective permit coverage start date and each successive 365 days from that date in years two through five. The Annual Report is not required to be submitted under the ISGP. It only needs be retained onsite and provided to IDEM upon request.
What changes are there for facilities claiming a condition of “No Exposure”?
The requirements and eligibility for No Exposure facilities is generally the same as under Rule 6. And, unlike NOIs for permitted facilities, No Exposure Certifications (NECs) are not required to be submitted within a specified time frame after issuance of the ISGP. Expiration of current NECs will remain the same as listed in your most recent NEC acknowledgment letter from IDEM. Once the ISGP goes into effect, all future NECs must be submitted through the Regulatory Service Portal.