Articles

Category

Phase I Portfolio for Renewable Energy Developer

August Mack was retained to develop an environmental due diligence program for a national developer of renewable energy at multiple sites in the state of New York. In most multi-site portfolios, all sites are bundled under the same contract, allowing the client to realize cost-savings by combining multiple site inspections with limited mobilizations. The challenge … more »

Mold Remediation Project For Historic Commercial Properties

August Mack has had a 17-year relationship with a full-service real estate investment company who owns and/or manages over 20 million square feet of industrial, office and mixed-use properties across the U.S. For this project, the client partnered with an Indianapolis-based real estate development company to purchase a mostly historic four-building commercial property encompassing an … more »

Environmental Compliance Assurance Relationship With Glass Manufacturing Facilities

August Mack began a working relationship with an Ohio-based glass manufacturing company providing environmental compliance support services. Initial projects involved the completion of air emission inventories and a ventilation survey at their main facility. August Mack was later retained to provide continued environmental compliance assistance by implementing our Compliance Assurance Program (eCAP®). Using our eCAP® … more »

Recycling Facility Stormwater Review

August Mack was contracted to review the existing stormwater compliance management program at six scrap recycling centers and identify areas of improvement.    Following a review of each facility’s Notice of Intent, August Mack performed an inspection of each facility to determine if outfalls identified in past inspections continued to meet the regulatory definition of an outfall, as well as to locate any new or previously unidentified outfalls. During this process, current … more »

Five Railyard Portfolio

August Mack was retained by a Michigan-based short line railroad company to perform Phase I Environmental Site Assessments (ESAs) for five different railyards within the state. The purpose of this effort was to review each site’s history and evaluate the current conditions of each property in order to determine if any Recognized Environmental Conditions (RECs) … more »

Pre-Renovation Asbestos Inspection

August Mack was retained by a national architecture firm in order to perform asbestos-containing material (ACM) inspections in nine buildings. These inspections were conducted within university campus buildings that were slated for renovation as part of an energy efficiency initiative. The inspections involved a thorough preemptive walk-through to visually identify potential ACMs in the areas … more »

267 Site RSRA Portfolio

August Mack was retained by an Ohio-based national bank holding company in order to carry out Record Search with Risk Assessments reviews (RSRAs) for 267 sites, pending their acquisition of another financial services company. These sites were located across Michigan and Wisconsin, as well as in Cleveland, Ohio and Chicago, Illinois. The properties primarily consisted … more »

56 Site Gas Station Portfolio

August Mack was retained by a law firm in Indiana on behalf of an oil company to perform a series of Phase I Environmental Site Assessments (ESAs) pending the sale of the company. The job included a total of 56 sites, consisting of active gas stations with attached convenience stores and a few vacant lots … more »

Creek Remediation

August Mack and and its subsidiary collaborated to design and build an interim Measure (IM) to protect and improve a local Indianapolis waterway, Pleasant Run Creek (PRC). The primary objectives of the project were to identify, evaluate and remediate areas within a former manufactured gas plant (MGP) site that were impacting or had the potential … more »

Electrical Resistive Heating

August Mack worked on a site in Indiana that is currently enrolled in the Indiana Department of Environmental Management’s Voluntary Remediation Program. This 0.25 acre site has a 2,600-square-foot commercial building that is currently occupied by a dry cleaning business. Solvent impacts of concern at the site include Tetrachloroethylene (PCE) and Trichloroethylene (TCE). After verifying … more »

SIGN UP FOR OUR NEWSLETTER